Illustrative report structure

A report built for the meeting after the schedule update.

This sample shows the shape of a DelayIQ report. It is illustrative only: the project names, scores, probabilities and dates below are not a forecast or a claim about any real project.

Illustrative output — not a live project forecast, benchmark or contractual opinion.
DELAYIQ / RISK REVIEWIllustrative example · Rev 01
HEALTH SCORE64/100 · requires review
PROJECT CONTEXT

Illustrative elevated-corridor package

UPDATE DATE24 JUN 2026

PLANNED FINISH18 MAR 2027

REVIEW FOCUSLogic, float and interfaces

PRIORITY RISKS

Items to discuss first

Illustrative only
WP-14Pier-cap and bearing worksHigh+21 days
WP-09Utility diversion interfaceWatch+13 days
WP-22RE wall backfilling sequenceWatch+8 days
REVIEW NOTE

Trace each signal back to the programme and site context before acting.

A report is designed to make a planning discussion more specific: what changed, which linked activities are under pressure, what information is missing, and which intervention should be tested next.

What a full review covers

Go beyond a single score.

The full-report experience is intended to turn schedule observations into a structured record for planners, PMCs and project leaders.

Health and data-quality viewWhat was read from the file, which signals are present, and where the underlying programme needs closer inspection.
Risk and root-cause framingPriority work packages, linked conditions and the schedule patterns that merit a technical review.
Forecast, impact and intervention sectionsA structured forward-looking discussion aid, with assumptions that must be reviewed by the project team.
Exportable decision recordA downloadable report for the regular project review process, subject to the plan selected.