Illustrative report structure
A report built for the meeting after the schedule update.
This sample shows the shape of a DelayIQ report. It is illustrative only: the project names, scores, probabilities and dates below are not a forecast or a claim about any real project.
Illustrative output — not a live project forecast, benchmark or contractual opinion.
HEALTH SCORE64/100 · requires review
PRIORITY RISKS
Illustrative onlyItems to discuss first
WP-14Pier-cap and bearing worksHigh+21 days
WP-09Utility diversion interfaceWatch+13 days
WP-22RE wall backfilling sequenceWatch+8 days
REVIEW NOTE
Trace each signal back to the programme and site context before acting.
A report is designed to make a planning discussion more specific: what changed, which linked activities are under pressure, what information is missing, and which intervention should be tested next.
What a full review covers
Go beyond a single score.
The full-report experience is intended to turn schedule observations into a structured record for planners, PMCs and project leaders.
Health and data-quality viewWhat was read from the file, which signals are present, and where the underlying programme needs closer inspection.
Risk and root-cause framingPriority work packages, linked conditions and the schedule patterns that merit a technical review.
Forecast, impact and intervention sectionsA structured forward-looking discussion aid, with assumptions that must be reviewed by the project team.
Exportable decision recordA downloadable report for the regular project review process, subject to the plan selected.
Ready to see your own schedule?
Analyse a schedule