AI schedule intelligence for Indian infrastructure

See where schedule pressure is building — before the next review.

DelayIQ reads your live programme, detects schedule patterns linked to slippage, and produces a decision-ready risk report in minutes.

Drop your project schedule hereor click to browse · XER, MPP, XLSX, PDF
Choose file
NHMRRE+497
500+ projects analyzedHighways · Metro rail · Buildings
Live schedule intelligence
National Highway Package · 68% complete
DELAY RISKHIGH
Risk rising across 3 work packages
523Indian projects benchmarked
18.4MSchedule activities processed
84%High-risk package recall
6 minMedian analysis time
01 / WORKFLOW

From programme file to defensible risk signal.

No dashboard setup. No manual mapping. DelayIQ reads the relationships, calendars, constraints and progress logic already inside your schedule.

01

Upload

Submit P6 XER, Microsoft Project, Excel or a baseline PDF. Your original file remains unchanged.

02

Analyze

The engine checks logic density, float erosion, constraint pressure and patterns seen across comparable Indian projects.

03

Predict

Receive ranked work-package risks, likely delay windows and the indicators that need action now.

02 / SAMPLE OUTPUT

A report your project team can act on.

Clear enough for the weekly review. Detailed enough for the planning engineer.

DELAYIQ / RISK REPORT
Generated 28 Jun 2026 · Rev 04
PROJECT HEALTH SCORE
64/ 100

AT RISK · deteriorated 9 points since previous update

PROJECTNH-48 Elevated Corridor · Package 03

SCHEDULE DATE24 JUN 2026

PLANNED FINISH18 MAR 2027

PREDICTED FINISH09 APR 2027

FORECAST VARIANCE+22 DAYS

Planned completionPredicted completion
18 MAR09 APR
PRIORITY RISKS

Work packages most likely to delay

PACKAGERISK PROBABILITYFORECAST IMPACTSTATUS
WP-14Pier Cap & Bearing Works
84%
+21 daysCritical
WP-09Utility Diversion — Chainage 8+400
68%
+13 daysHigh
WP-22RE Wall Backfilling
51%
+8 daysWatch
BENCHMARK POSITION

Schedule resilience is below comparable projects.

Current programme ranks in the 31st percentile against 523 Indian infrastructure schedules.

Low resilience31st percentileHigh resilience
BUILT FOR SITE REALITYNot another generic PM dashboard.
03 / ENGINEERING CONTEXT

Signals grounded in how Indian projects actually slip.

DelayIQ does not judge a schedule against textbook perfection. It compares project logic against execution patterns found in highways, metro packages and large real-estate programmes.

Relationship integrityMissing logic, excessive lags and fragile critical paths.
Float consumptionWork packages burning contingency faster than progress.
Execution benchmarksRisk calibrated against comparable sector and project stage.
See what each report contains
04 / PREMIUM INTELLIGENCE

Move from “what is late” to “what will fail next.”

Root-cause analysis

See the schedule conditions driving each prediction.

90-day risk forecast

Project how current logic will affect upcoming milestones.

Cost impact range

Estimate exposure linked to predicted delay windows.

Contractor risk score

Compare delivery reliability across work packages.

Scenario comparison

Test recovery changes before issuing a revised programme.

Executive narrative

Auto-generated PMC summary with actions and evidence.

05 / PRICING

Pay for the level of control you need.

Start with one schedule. Move to monitoring when the project warrants it.

Free

Validate one schedule before committing.

₹0
Run free analysis
  • 1 schedule upload
  • Health score
  • Top 3 delay risks
  • No PDF download

Monthly Monitor

A report-credit pack for repeated schedule reviews.

₹9,999/ 30 days
View report packs
  • 10 full report credits
  • Saved report history
  • Full paid analysis on each credit
  • 30-day access period

Portfolio

High-volume access for PMCs and project teams.

₹49,999/ 30 days
Discuss portfolio use
  • High-volume report allocation
  • Saved report history
  • Full paid analysis
  • Priority project enquiries

Prices exclude applicable GST. Enterprise procurement and annual contracts available.

DATA SECURITY

Your programme is project-confidential. We treat it that way.

Encrypted in transit and at restTLS transfer and isolated file storage.

Automatic file deletionSource files removed after the configured retention period.

No training on client filesYour schedules are not used to train shared models.

START WITH THE CURRENT PROGRAMME

Find the delay risk already hiding in your schedule.

Upload one file. Get the first risk signal before your next progress review.